Black Friday3 months free · valued at up to $1,250Book by Thanksgiving
Sunwise Energy
(610) 228-2480
Back to articles

NJ SREC-II and ADI: What to Confirm Before Signing a Solar Proposal

Buying or leasing solar in New Jersey? Understand SREC-II ownership and ADI paperwork, then discuss the right payment structure with Sunwise.

Sunwise TeamPublished
In this article

Short answer: New Jersey's Administratively Determined Incentive program allows eligible certified systems to earn one SREC-II per 1,000 kilowatt-hours of qualifying production during a 15-year qualification life. Whether you receive those certificates depends on how you pay for the system. The state's own FAQ says it directly: "Whether the SREC-IIs are received by the host customer, by the installer, or by a third-party owner is determined based on the type of contract structure" (NJ Clean Energy Program, ADI Program FAQs). So before you sign anything, confirm three things in writing: who owns the SREC-IIs, who files and tracks the registration, and which documents and milestones you'll see along the way.

Sunwise helps New Jersey homeowners compare ways to pay for solar. SREC-II ownership belongs in that conversation because buying, financing or leasing can put you on different sides of the incentive. This checklist helps you connect the program paperwork to the agreement you are considering.

This isn't a guide to how much SREC-IIs are worth or whether solar pays off in New Jersey; the New Jersey solar ROI guide handles that. It's the paperwork check that comes before the math matters.

What the ADI program is, in two paragraphs

The ADI program is the residential and small-system path within New Jersey's Successor Solar Incentive framework. One SREC-II "is created when a solar system generates 1,000 kilowatt hours (kWh) of electricity," and its value is "administratively set in the ADI Program by the NJBPU," meaning a fixed amount by registration cohort rather than a traded market price. "Projects participating in the ADI Program are eligible to receive SREC-IIs for 15 years (known as the project's 'Qualification Life')."

SREC-IIs are separate from net metering. Net metering is the bill credit your utility applies for electricity you export; the New Jersey net metering guide explains how that works with PSE&G, JCP&L and the others. SREC-II income is a payment for production, whoever used the electricity, and it goes to whoever owns the certificates. Keep the two apart when you read a proposal.

Who owns the SREC-IIs under each contract type

The state FAQ spells this out by payment structure:

How you payWho owns the SREC-IIsWhat the FAQ says
Cash purchase or loanGenerally the system owner, subject to any assignment in the contractCustomers who buy or finance "own the SREC-IIs and are eligible for the incentive"
Lease or power purchase agreementThe company that owns the system"The Power Provider, not the customer, owns any SREC-IIs"

A lease or PPA isn't wrong because the provider keeps the certificates; the proposal's pricing may already reflect that. What matters is that you know which case you're in and that the written agreement matches what you were told. If a lease or PPA salesperson describes SREC-II income as yours, ask for the clause that says so, because the usual ownership arrangement is that it isn't. The lease and PPA explainer covers what else those contracts assign.

Confirm in writing: the contract names who owns the SREC-IIs for the full 15-year qualification life, and, if that's not you, whether any portion is credited back to you and how.

Who files the registration, and what you should see

Registration goes through the ADI online portal, and "all ADI program documents must be uploaded and submitted" there. The FAQ notes that "although customers can submit their ADI registration packet, typically the installer submits it on behalf of the customer," partly because "some of the program documents are technical and are required to completed by someone knowledgeable about solar equipment."

That's normal. It still leaves you with a role: knowing what was filed, when, and what came back. For a system you own, the FAQ lays out the sequence:

StepWhat happensWhat you should have afterward
1Initial ADI registration packet is submittedConfirmation of submission and the registration date
2Packet deemed complete"An ADI conditional acceptance letter will be issued"
3Installation and utility permission to operateInterconnection approval from your utility
4Post-construction certification package submitted"When your solar system installation is complete, you must submit your post-construction certification package"
5NJ Certification Number issuedThe number that identifies your project in the program
6Account opened in PJM-EIS GATSWhere SREC-IIs are created from your production data
7Account opened with InClime, the SREC-II AdministratorWhere certificates are processed and paid

The FAQ also describes the program "allowing 12 months for the solar installer to complete the installation, obtain permission to operate from the utility company and submit post-construction documents." Ask how the installer tracks that window and what happens if it's missed.

Confirm in writing: who submits each step, that you'll receive copies of the registration confirmation, conditional acceptance letter and NJ Certification Number, and who sets up and holds the GATS and InClime accounts.

Approval, production and payment are three different dates

Owners sometimes expect income to start when the system is turned on. It doesn't work that way. Conditional acceptance is approval to proceed. Permission to operate authorizes operation under the utility approval; it is distinct from program certification and payment. Certification is when the project is recognized in the program. SREC-II creation follows reported production, and payment follows certificate processing. Each has its own timing.

Confirm in writing: the registration date (which determines your cohort), the expected date for certification after PTO, how production is reported to GATS (meter, monitoring, or other), and how and when payments reach you.

The incentive amount: check the cohort that applies to you

The NJBPU sets SREC-II values by registration date, and the current table is on the ADI program page. This guide deliberately doesn't quote a dollar figure, because the amount that applies to your project is the one in effect for the cohort your registration lands in, and a proposal written months earlier may carry a different number.

Confirm in writing: the per-SREC-II value the proposal assumes, the registration cohort it belongs to, and a link or reference to the official table it came from.

The pre-signing checklist

QuestionWhere the answer belongsDone
Who owns the SREC-IIs for the full 15 years?Contract
If the provider owns them, is any value passed to me, and how?Contract
Who submits the ADI registration packet?Contract or written scope
Will I receive the registration confirmation and conditional acceptance letter?Written scope
Who submits the post-construction package, and by when?Written scope
Will I receive the NJ Certification Number?Written scope
Who opens and holds the GATS and InClime accounts?Written scope
What SREC-II value does the proposal assume, and for which registration cohort?Proposal with source
How is production reported, and how often are payments made?Written scope
What happens if the 12-month completion window is missed?Contract

Use the written answers to identify the responsibilities and assumptions in your proposal. Unresolved items need clarification; a checklist alone does not guarantee eligibility or payment.

How Sunwise helps you connect New Jersey incentives to your solar choice

An incentive only helps your decision when you understand who receives it and how it fits the proposed agreement. Start with Sunwise's New Jersey solar installation service to discuss your home, ownership preference and available payment options together.

Sunwise can help you compare payment structures and identify questions about incentives, ownership and timing. Use this checklist during that conversation to make the SREC-II recipient, registration responsibilities and expected documents explicit. Program eligibility and payments remain subject to the applicable rules; the written agreement must identify the services included in your project.

You do not need to choose an incentive arrangement before speaking with us. Bring your electric bill and tell us whether you are considering ownership, a lease or a PPA—or still deciding. A free consultation gives you a starting point for comparing those choices.

Discuss my New Jersey solar options with Sunwise

Talk with Sunwise: (610) 228-2480 ext. 1

NJ SREC-II and ADI FAQs

Do I get SREC-IIs if I lease my solar panels?

Usually not. The state FAQ says the power provider, not the customer, owns the SREC-IIs for leases and PPAs. Any arrangement that passes value to you has to be in the contract.

Who registers my system with the ADI program?

Usually the installer, on your behalf, through the ADI online portal. You can submit it yourself, but parts of the packet are technical. Either way, ask for copies of what's filed and what comes back.

How long do SREC-II payments last?

Fifteen years from the project's qualification, which the program calls the Qualification Life.

When do SREC-II payments start?

After the system is operating, certified in the program, and set up in GATS and with the SREC-II administrator. Utility permission to operate is separate from certification and certificate payment.

How much is an SREC-II worth?

It depends on the registration cohort. The NJBPU publishes the current values on the ADI program page; confirm the figure for your registration date rather than relying on an older proposal.

References

  • New Jersey Clean Energy Program, ADI Program FAQs, SREC-II definition, 15-year qualification life, who submits registration, step sequence, 12-month completion window, ownership by contract type, GATS and InClime accounts
  • New Jersey Clean Energy Program, Administratively Determined Incentive (ADI) Program, program page with the current incentive value table

Program terms and incentive values are set by the NJBPU and change by registration cohort. Confirm current terms on the official program pages and in your written agreement. This guide is educational and isn't legal, tax or financial advice.